Doha Office Building
Doha Office Fittings
Roof Lifting Into Place
Lifting Completed Unit Into Place
Final Unit Installed
Office Structure
Decorative Flashing Installed
Qatar Operations Offices
Year: 2015Project: 8 Office Blocks, 182 Units
Size: 2500m2 – 8 Buildings
The prefab buildings, delivered in November 2015, were all flat packed with interior wiring installed for ease of on site installation. The end product, 8 separate office buildings with a total of 2,708m2, was erected and ready for use in only 1 month's time after delivery.
In addition to providing and erecting the flat packed buildings, PBS technical staff were onsite well before any of the work including procurement began.
This is the PBS standard procedure meant to ensure that the project is professionally evaluated so as to adequately capture the needs and scope with the goal of correctly advising the procurement and supply process on the products and services needed.
All modular prefab buildings were designed and engineered to meet the stringent Qatar Kahraama regulations.