Geita Gold Mine Camp
Year: 2016Dormitory with ensuite bathrooms = 330m2
Gym = 120m2
Kitchen = 180m2
PBS in May 2016 was contracted to undertake the full installation of a flat pack container camp including dormitory with ensuite bathrooms, gym, and kitchen buildings at the Geita Gold Mine, Tanzania.
Prefab Building Solutions' full service approach, i.e. A-Z support in design, labour supply, installation of buidlings, full building connections to main electrical and plumbing as well as in the supply and installation of all furniture and fittings allowed for a project run-through time of only 5 weeks from delivery - with only 8 skilled workers!
The quick build method offered by PBS with full material and labour supply is attractive in remote areas where traditional buildings can take from 6 months to 1 year to complete.